| |
Earthing the contact wire to ensure safety. |
| |
Lifting up the old tracks, removing the ballast and
smoothing the road-bed. |
| |
Use ethyne-oxygen flame (temperature 1350 degree Celcius) to cut
the rail. |
| |
A diamond point was placed on the ground for welding. It would be
moved to the road bed very soon. |